Letter dated September 29, 1924 from Minnesota Commissioner of Highways C. M. Babcock to Mayor Coffeen requesting formal resolution from Stillwater City Council regarding maintenance of bridge.
Notes dated July 28, 1924 of Hudson, Wisconsin Mayor George H. Tappins regarding cost of Hudson bridge. The handwritten notes are written on the back of a blank invoice for Consolidated Lumber Company, Retail Yards in Stillwater, Minnesota.
Letter dated July 23, 1924 from Minnesota Commissioner of Highways C. M. Babcock to Mayor R. J. Coffeen declaring that no action taken on permanent designation of route to include interstate bridge.
Letter dated July 10, 1924 from Stillwater Mayor R. J. Coffeen to C. M. Babcock, Commissioner of Highways regarding maintenance, repair and ownership of proposed bridge, including Chap. 530 Laws 1919. Article 16 Constitution of Minnesota regarding Route No. 45.
Letter dated April 3, 1924 from Stillwater Mayor R. J. Coffeen to C. M. Babcock, Commissioner of Highways regarding ownership of the bridge, Chapter 323 of laws of 1921 and the role of the state highway commission.
Letter dated April 2, 1924 from City Attorney Edwin D. Buffington to Stillwater Mayor R. J. Coffeen regarding the proposed financing of the free interstate bridge.
Letter dated January 20, 1911 from E. J. Miller, Minnesota Highway Department to Stillwater City Engineer J. Abercrombie regarding the life expectancy, suggested method of repars and posted speed and wieght limits of the existing Stillwater pontoon bridge
This booklet describes the planning and building of the Duluth Aerial Ferry Bridge in 1904-1905. Many photographs and drawings illustrate the progress and describe the working of the bridge. Details on dimensions, specifications, and costs of operation are provided.
Fifty-second Congress First Session Executive Document Number 80 United States Senate
Date Created:
1892-04-18
Description:
Thirty-one page government document, beginning with a letter form the Secretary of War, in response to Senate resolution of April 12, 1892, relative to the proceedings of the board of officers convened to consider the construction of a bridge in Duluth. This document is discussing placing a bridge over the Duluth ship canal where a bridge has never existed. The document uses the language "Aerial Lift Bridge" which must have been a design under consideration. In fact, the Aerial Ferry Bridge, or Aerial Transporter Bridge was the initial bridge constructed in 1904-1905. It wasn't until 1929 that the first bridge was remodeled with a lift span.
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
Letter dated February 5, 1887 from Brig. General, Chief of Army Engineers James C. Duane to Senator Dwight M. Sabin indicating that the War Department has no authority over shortening the pontoon draws, as the bridge was built under the authority of the Minnesota Legislature.
Letter dated January 28, 1887 from Major of Engineers Charles J. Allen to General James C. Duane suggesting shortening the draw of pontoon bridge from 330 to 200 feet.
Letter dated January 17, 1887 and envelope from Senator Dwight M. Sabin to Stillwater City Engineer Lewis W. Clarke assuring full support of the bridge project.
Letter dated January 14, 1887 from Stillwater City Engineer Lewis W. Clarke to Senator Dwight M. Sabin regarding repairs to the Stillwater bridge and suggested changes for the bridge.