Winter scene of piled logs on the Red Lake River, late 1800s. Inscription on the reverse reads: "T. M. Partridge Lumber Company Mpls. MN., waiting for the drive to start."
Construction of the Lake Zumbro Hydroelectric Power Plant dam began in this area of the Zumbro River in 1917. The structure was designed by noted hydroelectric engineer, Hugh Lincoln Cooper. The dam, completed in 1919, is owned by Rochester Public Utilities.